Regarding Repaving:
As an ongoing improvements on the City’s streets The City of Minneapolis, Department of Public Works is planning on a resurfacing (mill and overlay) in these two areas (called in the Harriet/Lakewood area and these areas DO cover parts of Kingfield Neighborhood) in the summer of 2017. These two projects were originally built in 1980 & 1978 respectfully. As part of the funding for this work, there will be a property assessment included as a part of this project. City staff will be available to discuss this in more details at the upcoming meeting with KFNA on November 9.
Regarding Bikelanes:
The proposed bikeway project on 42nd/43rd St W would be installed following the resurfacing work and would not require additional roadway closures. The current scope and status of proposed 2017 bikeway projects in the area to be discussed at this meeting includes:
42nd/43rd St W (Kingfield and East Harriet)
- Project limits: Lake Harriet Parkway to Nicollet Ave
- Bikeway project is in coordination with resurfacing planned for 2017
- Proposed as a bike boulevard with no parking removal
38th St W (East Harriet)
- Project limits: Bryant Ave to Lyndale Ave
- Bikeway project is in coordination with resurfacing planned for 2017
- Proposed as bike lanes with parking removal on the south side
Note: 38th St is on the Bike Plan east of Lyndale and the City is asking if the community would like to install bike lanes there as well. If there is interest in moving that conversation forward, or not, be good to hear from the community at this meeting.